Solar Electric Panels

Advance:
Solar, Hydro, Wind
Power, Inc.

Grid Tie Interface Systems
INFORMATION:
AdvancePower.Net

COMPONENTS:



Advance Power Wind Turbine Systems


API-FREE and API-VAWT Wind Turbines are CEC approved and
eligible for both a CEC Rebate and a 30% Federal Tax Credit


Features of Advance Wind Power Grid Tie Systems:
  • Advance Power can do Wind Grid Interface System installations anywhere in California and our Total System Packages also include the Tower engineering. Call us for a quote.
  • Wind Turbines produce electricity used first by the Residence or Business. Utility Grid Power is the backup when the wind speed is too low.
  • Excess Wind Power is sent directly to the Utility Grid by a an Aurora Power One Wind Interface and Grid Tie Inverter combination.
  • The Wind Inverter automatically synchronizes to the Utility Grid and shuts off the connection if the Grid goes down.
  • Advance Wind Power System capacities go from 500 Watts up to 20 kW.
  • API Wind Turbines have high efficiency even at low wind speeds.
  • Our API-FREE models are 3 Blade Horizontal Axis Wind Turbines (HAWT), while the API-VAWT models are Vertical Axis Wind Turbines (VAWT).
  • Small Grid Tie Interface Wind Systems in California are eligible for the Emerging Renewables Rebate of $2.50 per watt for the first 7.5kW and $1.50 per watt up to 30kW. This amounts to $22,500.00 for a 10kW System.
  • API-FREE and API-VAWT are both listed as Eligible Small Wind Turbines by the CEC.
  • Wind Power Systems also get a Federal Tax Credit based on 30% of the Total System Cost that may be carried forward 2 years. Commercial Wind Systems can get a Cash Grant for 30% of the Installed System Cost instead of the Tax Credit if they choose.
  • Rural Small Businesses and Farms may also be eligible for USDA guaranteed loans for up to 75% of a wind system's installed cost and a cash grant for up to 25% of the cost. The total cannot exceed 75% and the business must comply with Small Business Administration size and location standards. Farms must derive 50% of their income from agriculture.
  • This DSIRE website has more Federal Incentive information. It also has other State's Incentive information.
  • This FarmEnergy.org website has more Farm and Rural Business Incentive information.
  • This AWEA Website has information for consumers about California's Small Wind Permitting procedures.
  • For more API-FREE and API-VAWT Wind Turbine information go to Advance Power's Wind page.

Aurora Inverter

Aurora Power One Inverter

Photo Gallery of API-FREE Wind Turbines


Photo Gallery of API-VAWT Wind Turbines

API-VAWT WIND TURBINES

For more information go to Advance Power's Wind Power page.


Wind Turbine Grid Tie System

We Test All Our Products
And Use Them at Our Home and Business


Please browse through our products.
If you are interested in placing an order or want more information,
please call 1-888-228-9694 toll free or (707) 485-0588 or E-mail us


TOP HOME ORDER